This is a test of GDPR / Cookie Acceptance [about our cookies]
Really irritating test - cookie expires in 24 hour!
Reading station praised by commuters
As at 21st November 2024 16:18 GMT
 
Re: Reading station praised by commuters
Posted by eightonedee at 11:38, 19th November 2024
 
For those wanting a short dose of nostalgia for the old (and previous) incarnations of Reading Station, this came up on my You Tube feed today-

https://www.youtube.com/watch?v=1IqpyY2A5uE

Will there be an hour-long special from "Stations from the Air" on Reading Jaymac/Finn? (or would that require too many prior approvals?)

Re: Reading station praised by commuters
Posted by IndustryInsider at 10:41, 28th September 2024
 
Good to hear.  Mind you it will need that sort of investment at least every ten years as despite CCTV enough idiots use it to mean it had become a right state with ceiling panels missing and vandalised.

I thought the idea was to redo the ceiling, in particular, not using loose panels within convenient idiot-reach. Of course it still may not be entirely idiot-proof.

That’s pretty much what they’ve done.  Stripped it largely back to bare surfaces, painted metal/bare concrete, which will be much harder to reach.  It actually looks better that way anyway as there’s much more height in most places now so it feels less claustrophobic.

Just a small section of the ‘original’ ceiling panels left at the Caversham end, where the panels were quite high comparatively anyway.

Re: Reading station praised by commuters
Posted by stuving at 23:49, 19th August 2024
 
Good to hear.  Mind you it will need that sort of investment at least every ten years as despite CCTV enough idiots use it to mean it had become a right state with ceiling panels missing and vandalised.

I thought the idea was to redo the ceiling, in particular, not using loose panels within convenient idiot-reach. Of course it still may not be entirely idiot-proof.

But at least I should not keep hearing from my sister (who lives in Caversham) about how the very limited signage leads so many people to exit on the wrong side of the station and then find it's a very long walk (and luggage-drag) round to the other side.

Re: Reading station praised by commuters
Posted by IndustryInsider at 20:21, 19th August 2024
 
Good to hear.  Mind you it will need that sort of investment at least every ten years as despite CCTV enough idiots use it to mean it had become a right state with ceiling panels missing and vandalised.

Re: Reading station praised by commuters
Posted by Marlburian at 16:57, 19th August 2024
 
The underpass/tunnel beneath Reading Station is to re-open tomorrow. It's  been closed for more than 14 weeks, after "a £400,000 refurbishment means that cyclists should now be able to safely use the route for the first time", says the Reading Chronicle in an article that's probably behind a paywall.   

Comments appended to the article raise doubts about how responsible some cyclists will be with regard to pedestrians. My only experience of it a few years ago was not helped by some riders coming towards me.

Other memories go back to the 1970s when I used it to get to the Red Star parcels office on the northern side. There was a subterranean barber's shop at the south end.

Re: Reading station praised by commuters
Posted by grahame at 07:35, 8th August 2024
 
There seems to be a national issue with the reliability and maintenance of lifts and escalators on the railways.

Indeed - and I am splitting that into a separate thread - http://www.passenger.chat/28985

Re: Reading station praised by commuters
Posted by CyclingSid at 07:05, 8th August 2024
 
The problem is that they don't seem to have any corporate memory. Another long-running and later revamp, Gatwick Airport, repeats some of these. Signage to find the correct platform at Gatwick is inadequate, it seems to assume that everybody is there only for the airport.

There seems to be a national issue with the reliability and maintenance of lifts and escalators on the railways.

Re: Reading station praised by commuters
Posted by eightonedee at 20:45, 7th August 2024
 
Here’s a comprehensive personal view from someone who commuted most days changing trains at Reading between 2001 and the onset on lockdown in 2020, and intermittently during the inter- and post-lockdown period until retirement in April 2022. I also usually go to Reading, my nearest large town, by train, so still use it (I’d guess) about 10 times a year.

Pluses-

1-   So much more circulation space than the old station. Apart from the area around platforms 4 to 6, particularly platform 4, where there is simply not enough room for Gatwick-bound passengers and their luggage when a busy incoming train arrives and disgorges its load. Sometime ago, I posted about a conversation with what appeared to be senior GW staff who acknowledged that this was a shortcoming. Space is also a bit tight in places on the higher-numbered between the platform edges and some platform buildings. However, when I pass through other stations (let’s name and shame Birmingham New Street in particular) I appreciate how much better than many it is, and it’s difficult to imagine how it coped before the rebuilding. Remember the divided overbridge to the multi-storey car-park? It also highlights how cramped some of the 1980s-rebuilt stations are – see Guildford or Oxford, for example.

2-   Generally, it has a bright airy and open feel to it – perhaps too much – see below! It’s up there with two personal favourites, York and Newcastle Central, and much better than claustrophobic warrens like New Street, or frantic crowded barns – like London Bridge.

3-   Good facilities for the mobility impaired.

4-   Apart from the pigeon problem, and some extensive rust on some roof pillars, it seems to be standing up to its heavy use quite well

Minuses (some partly addressed)

   1 - The original signage was poor. Even friends familiar with the old station and the town commented on this. There has been some improvement, notably the large comprehensive departures board just inside the town entrance once a few initial glitzes were resolved. It’s clear and has enough full information sufficiently far in advance that it seems to cater well for the numbers and range of services. The problem elsewhere appears to be a combination of –
A - the standard Network Rail white-on-mid blue signage with text too small, a big step backwards from the British Rail standard “Rail Alphabet” black or red on white that I understand from those who claim expertise is still regarded as the gold standard.
B – the original (and remaining orange on black) electronic boards are too small, both the departure boards - such as the one by the new enquiries stand on the overbridge, and the overhead ones around the station. They cannot show all the information (time due, time expected, destination, platform) together, and the overhead ones have to spool through 3 alphabetical and 2 chronological screens to show all the trains. Not ideal if you are rushing between platforms at a busy and large station when your incoming connection is late! SNCF seems to do so much better… I think his might be a general problem at Network Rail stations.
C – The design of the lift shafts, with the doors recessed into the shafts, coupled with a strange lack of overhead signs perpendicular to the shafts so that they can be seen along the platform or overbridge (as the case may be). Many applications of first pale orange and later bright yellow signs has just about made them visible to the stranger to the station!
D – Some really daft omissions – notably the signs on the sides of the escalators that seem to be sending people up the escalators to get to the lifts, instead of around the back of them where the lift shafts actually are (I’ll try to remember to attach a photo to this post).

   2 – As hinted at above, there’s not a lot of shelter. Pity the gateline staff at the town entrance standing in the enormous aperture open to the south-west wind. Pity the passenger hoping to find somewhere inside in the dry to wait.  There’s a lack of inside waiting on many platforms. The waiting room at the “B” end of platforms 12 and 13, from which some of the busiest west-bound commuter and shopper trains depart have just 8 inside seats – in a building the size of a 50-seater single-deck bus. Rain blows into the overbridge, and the outer ends of platforms 4 to 6 are particularly exposed, perched on top of the Vastern Road bridge. Diesel smoke can also blow into the space between the deck and roof of the overbridge from trains standing running their engines, making it unpleasant for most, risky for those with respiratory problems. The upswept edges to the platform roofs seem to contribute to the funnelling of the fumes, as well as providing poor shelter to passengers on the platforms below when it rains.

   3 – There’s one continuing issue about the dark charcoal material used for the floor of the overbridge and some areas at platform level. If wet it becomes very slippery, and sometimes in humid weather (usually involving the cooling of very damp air) it “sweats” with the same result. Mopping and rugs have been used, but it is surprising in this age of health and safety how unsuitable flooring materials are used in areas of high public use. That comment applies to other building elsewhere too – why is so much lethally slippery polished “marble” laid in places where wet gets in or is walked in on the shoes of visitors?

   4 – Missing the opportunity to create a really good public transport interchange in Reading town centre. 50 years ago, taxis and “Corporation” buses ran from Station Hill just outside the main entrance and Alder Valleys from old covered bus station opposite under Top Rank, connected by an underpass to the station (OK – it was one of the most insalubrious places in the entire town).  It’s quite a trek to the open bus stands and taxi rank on the Caversham side.

   5 – The escalators. When they were being installed, an architect acquaintance told me it was a bad idea, as they are not designed to be used in the open, or “part-open”. He has been proved right!

Issues now apparently resolved-

   1 – The lack of information points. It has taken a long time to arrive at the position where there is a permanent information booth on the overbridge, although when I now travel through mostly out of peak time it is often un-manned.

   2 – The habit of letting off two or more announcements loudly on different platforms at the same time, so that you were both deafened by the volume but had no idea if what was being said might be relevant to you. This hasn’t happened for a long time, but it might only have been done to annoy peak-time commuters!

This might look like a long whinge, but reflects how some minor irritations rankle when you have had a long day at the office, and you get stuck for half an hour for a missed connection, be that due to delay or cancellation. However, it generally does a good job at handing the volume of traffic and is the station Reading needed and deserved.  I have noticed how old or drab many other main city stations look now – Southampton Central or Plymouth are two that spring to mind.

It was also remarkable that the whole Reading station reconstruction and associated remodelling of the busy junctions to the west was reportedly completed within time and budget, given the site constraints and key nodal point on the network. It can be done!

This was of course now over 10 years ago. We missed marking the tenth anniversary of its opening back in April on this forum, so a belated “Happy Birthday” new Reading Station!

PS - apologies, the attached image seems to have rotated through 90 degrees - perhaps it's trying to work out where the lifts are..

Re: Reading station praised by commuters
Posted by didcotdean at 17:04, 7th August 2024
 
Escalators out of service seems an ongoing issue in recent months; whether this is through planned maintenance or failures I don't know. Escalators running in open air locations can be temperamental.

Re: Reading station praised by commuters
Posted by Oxonhutch at 12:48, 7th August 2024
 
The new Reading station is fine until it rains in any direction except perfectly vertical - which is very rare in my experience. The passenger is now going to get wet - sometimes very so - getting on or off a train as the canopies sweep upwards leaving a huge gap for that rain to get through.

The old Edwardian station had canopies that hugged and overhung the carriage roofs on the platforms and kept everyone perfectly dry.

So Reading station: stylish - yes; practical - no.

Re: Reading station praised by commuters
Posted by paul7575 at 12:27, 7th August 2024
 
Weren’t there signs on the footbridge about the toilets being on the A side or B side of the islands, which was a slightly odd usage because most people would refer to the A end or B end of the platforms…

Paul

Re: Reading station praised by commuters
Posted by Marlburian at 09:22, 7th August 2024
 
As someone with eyesight issues I'm very impressed with the legibility of the departure boards near the main gates.

Re: Reading station praised by commuters
Posted by Ralph Ayres at 23:12, 6th August 2024
 
Reading station is mostly fine after the upgrade, but the decision to leave the toilets at the remote ends of the platforms (I assume that's where they'd always been) and then fail to signpost them clearly was unfortunate. If you start by facing the wrong way there's nothing to tell you they're in the opposite direction, particularly pertinent as they're not even consistently at the same end of each platform.  Locating a larger unit on the new footbridge instead would have been far more convenient (sorry!) whether arriving/leaving or changing trains, with an extra set at ground level to cover platforms 1-7.  This arrangement would also probably have needed fewer WCs, sinks and urinals overall, and cleaning/servicing would have been simpler.

Re: Reading station praised by commuters
Posted by TaplowGreen at 19:37, 6th August 2024
 

It is a nice station, I'm sure those (like myself)who remember the state of the old Reading station would recognise the huge improvement.

Just a shame the train service hasn't improved to a similar level.

Reading station praised by commuters
Posted by Marlburian at 14:04, 6th August 2024

 
The Coffee Shop forum is provided by customers of Great Western Railway (formerly First Great Western). The views expressed are those of the individual posters concerned. Visit https://www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules ( graham AT sn12.net ).

Although we are planning ahead, we don't know what the future will bring here in the Coffee Shop. We have domains "firstgreatwestern.info" for w-a-y back and also "greatwesternrailway.info"; we can also answer to "greatbritishrailways.info" too. For the future, information about Great Brisish Railways, by customers and for customers.
 
Current Running
GWR trains from JourneyCheck
 
Links in development

Member contributions
Recent new POSTS
Recent new THREADS
Popular Threads
Member Polls
Transport Diary
So far this month
Search for

Also on our site
About the forum
Whitelisted (public) documents
On this travel day
2B added - Individual Station Data

User site admin
Tailor your experience

Externnal Links
JourneyCheck
2B added - Live Station updates
2B added - Booking engine links
BBC news feed

Old site pages - active
About the Coffee Shop
Acronymns and Abbreviations

Old site pages - being replaced
BBC News Feed
Recent New Topics
Popular Threads
Members Polls
On this day
Diary
So far this month
Forum Home Page
 
Code Updated 13th September 2024
From https://greatwesternrailway.info/t28980.html?topic=28980.msg349793 - go insecure