Just noticed from this video on You Tube that the Heathrow expansion will cost £49bn. And people were complaining that HS2 is going to cost £100bn. HS2 seems like better value for money than Heathrow expansion.
Both costing far too much and ridiculously delayed.
However............
Heathrow is a national and international flagship and can get you from West London to almost anywhere in the World.
HS2, for more than twice the price, at some indeterminate time in the future, will be able to get you from West London to..............Solihull.
Happy to talk value

I remain puzzled as how any such figures are produced.
For example, how was such a precise 'figure' of £49,000,000,000 calculated?
Perhaps,
Planning permission applications, £8,000,000;
Civil engineering and construction costs, £10,000,000,000
Consultants fees, £38,992,000,000
Total = £49 billion.
Ah, now I see.

| Re: Winterstoke Road Bridge, Weston super Mare - closed for two years In "The West - but NOT trains in the West" [380595/31150/31] Posted by Chris from Nailsea at 09:32, 8th October 2026 | ![]() |
An update, from the BBC:
Bridge replacement delayed due to summer heatwaves

The key route will have shut to traffic for more than two years by the time it opens - Image © North Somerset Council
The replacement of a key 85-year-old bridge which has been shut since 2025 has been delayed due to the summer's heatwaves.
Winterstoke Road Bridge, a key transport link through Weston-super-Mare, was supposed to reopen to traffic in the summer of 2027, however North Somerset Council said this has been delayed to early 2028.
The delay to the new £11m bridge, which closed to traffic in November 2025, was caused by the summer's persistent hot weather sparking safety concerns for the railway track.
North Somerset Council leader Mike Bell apologised for the delay, adding the council's priority "is to get the route open to vehicles as early as possible".
(BBC article continues)

The key route will have shut to traffic for more than two years by the time it opens - Image © North Somerset Council
The replacement of a key 85-year-old bridge which has been shut since 2025 has been delayed due to the summer's heatwaves.
Winterstoke Road Bridge, a key transport link through Weston-super-Mare, was supposed to reopen to traffic in the summer of 2027, however North Somerset Council said this has been delayed to early 2028.
The delay to the new £11m bridge, which closed to traffic in November 2025, was caused by the summer's persistent hot weather sparking safety concerns for the railway track.
North Somerset Council leader Mike Bell apologised for the delay, adding the council's priority "is to get the route open to vehicles as early as possible".
(BBC article continues)
Just noticed from this video on You Tube that the Heathrow expansion will cost £49bn. And people were complaining that HS2 is going to cost £100bn. HS2 seems like better value for money than Heathrow expansion.
More likely both are overpriced and aren't value for money.
From the BBC:
What to expect from a restored Birnbeck Pier

After closing due to safety reasons in 1994, Birnbeck Pier is due to reopen in summer 2027 - Image © Getty Images
After years of a complex and costly refurbishment, Birnbeck Pier in Weston-super-Mare is due to reopen in 2027.
The iconic pier, the only one in the UK to link the mainland to an island, opened in 1867 and was visited by millions before safety concerns led to its closure in 1994. But from next summer, visitors will be able to walk over to Birnbeck Island for the first time in a generation.
As the ambitious restoration works now have a completion date, here's everything you need to know about what visitors can expect.
...
In its heyday, the 19th Century pier hosted funfair rides and drew crowds of visitors who stopped off in Weston-super-Mare on pleasure steamers. But after a storm caused severe damage in 1990, Birnbeck Pier partially collapsed into the sea.
Then after years of it crumbling away, plans began to restore it to its former glory in 2006, but they have were repeatedly shelved over the years due to changes in ownership and financial concerns.
North Somerset Council - which bought the pier in 2023 - almost scrapped the restoration project in September 2025 after the RNLI, which used to be based on the pier, backed out of the plans, but in March the government provided the £19m of funding required to finish the restoration.
The council now says the pier is on track to reopen in the summer of 2027.
...
The future of the former RNLI lifeboat station on the other side of the pier remains uncertain.
An RNLI spokesperson said: "We remain committed to lifesaving in Weston super Mare and are continuing to work closely with our volunteers and North Somerset Council to find a suitable permanent location within the community."

After closing due to safety reasons in 1994, Birnbeck Pier is due to reopen in summer 2027 - Image © Getty Images
After years of a complex and costly refurbishment, Birnbeck Pier in Weston-super-Mare is due to reopen in 2027.
The iconic pier, the only one in the UK to link the mainland to an island, opened in 1867 and was visited by millions before safety concerns led to its closure in 1994. But from next summer, visitors will be able to walk over to Birnbeck Island for the first time in a generation.
As the ambitious restoration works now have a completion date, here's everything you need to know about what visitors can expect.
...
In its heyday, the 19th Century pier hosted funfair rides and drew crowds of visitors who stopped off in Weston-super-Mare on pleasure steamers. But after a storm caused severe damage in 1990, Birnbeck Pier partially collapsed into the sea.
Then after years of it crumbling away, plans began to restore it to its former glory in 2006, but they have were repeatedly shelved over the years due to changes in ownership and financial concerns.
North Somerset Council - which bought the pier in 2023 - almost scrapped the restoration project in September 2025 after the RNLI, which used to be based on the pier, backed out of the plans, but in March the government provided the £19m of funding required to finish the restoration.
The council now says the pier is on track to reopen in the summer of 2027.
...
The future of the former RNLI lifeboat station on the other side of the pier remains uncertain.
An RNLI spokesperson said: "We remain committed to lifesaving in Weston super Mare and are continuing to work closely with our volunteers and North Somerset Council to find a suitable permanent location within the community."
The BBC item contains much more detail - I have selected just some aspects to quote here. Please do click on the BBC article to view more.
CfN.

| Re: Disused rail viaduct over the Spey at Garmouth fails In "Railway History and related topics" [380592/31260/55] Posted by Richard Fairhurst at 07:16, 8th October 2026 | ![]() |
More than a small whiff of AI about that briefing!
| Re: Thames Valley infrastructure problems causing disruption elsewhere - 2026 In "Across the West" [380591/31163/26] Posted by TaplowGreen at 06:42, 8th October 2026 | ![]() |
From National Rail.
Route(s) affected
through London Paddington
Description
A fault with the signalling system at London Paddington means that Elizabeth line services must run at a reduced speed on some lines.
As a result, Elizabeth line services to / from this station may be cancelled, delayed or revised.
Disruption is expected until 10:00.
| West Wiltshire Rail User Group / 2027 meetings In "Diary - what's happening when?" [380590/32593/34] Posted by grahame at 04:15, 8th October 2026 Already liked by Chris from Nailsea | ![]() |
West Wiltshire Rail User Group / public meetings for 2027. These are provisional dates from (last night's) Committee Meeting - to be confirmed with the hall. On past record, they are sufficiently probably for you to put them into your diaries
17th March 2027
19th May 2027
15th September 2027
24th November 2027
We are holding Saturday, 5th June for a 90th birthday party for Dilton Marsh Station. Although a pensioner in human years, in some ways Dilton Marsh is our "child", being the most recent completely new station opened in Wiltshire.
For 2027, we are looking to booking the hall (*) half an hour earlier and starting the talk 30 minutes earlier too (hall open at 18:30 for a 19:00 meeting). This better fits trains arriving from Swindon, Chippenham and Melksham, and the local trains from both Avoncliff and Dilton Marsh. This means that the evening may end a few minutes earlier - noting the need for speakers and some departures to be on the train at a couple of minutes to 9. Other trains remain in place just after 9:20 and I'm sure networking will extend for those catching them.
Committee meetings are held in the evening of the first Monday of the (usually) alternate month at 5 p.m. in the ASDA community room. We have one committee member nominated to speak for each of the seven stations, and chair, treasurer and secretary who also may double up to speak for a particular station. The Committee is elected at the AGM but the nomination / elections process is a friendly and not-really-competitive one, and we can co-opt along the way if we wish. With the retirement of Rosemary this year, we have a bit of a gap and would welcome someone to update us and speak for and about Warminster. We are also aware of "out of town" interest - whilst we are very much West Wiltshire in our geography, there are fuzzy edges; we have a committee rep for Frome, and also look outwards and welcome members from Chippenham and Bath Spa who would also be welcomed onto the committee with an interest in services into West Wilts from those places.
(*) - Bethesda Church Hall, Gloucester Road, Trowbridge - about 100 yards from the station. There is (sshhh!) free onsite parking for people attending meetings - you do need to check in on the machine in the hall. There is also wheelchair access to the hall.
| Re: Harrow & Wealdstone 8th October 1952 & Nursing Lieutenant Abbie Sweetwine. In "Railway History and related topics" [380589/25546/55] Posted by Chris from Nailsea at 00:44, 8th October 2026 | ![]() |
The link to YouTube which I posted above still works, and I have just watched it again, on this sad anniversary.
It is worth 37 minutes of your time, members and guests of the Coffee Shop forum, as a sombre reminder of what could have / did go wrong.
Chris from Nailsea.

| Re: 5th October 2026 - "History of Melksham Station" talk in Atworth - 5th Oct 2026 In "Diary - what's happening when?" [380588/32416/34] Posted by Chris from Nailsea at 00:28, 8th October 2026 | ![]() |
| MOVED: Clifton Suspension Bridge - toll road bridge in Bristol In "Buses and other ways to travel" [380587/32592/5] Posted by Chris from Nailsea at 00:08, 8th October 2026 | ![]() |
This topic has been moved to The West - but NOT trains in the West.
https://www.firstgreatwestern.info/coffeeshop/index.php?topic=1888.0
An update, from the BBC:
Two-year revamp of suspension bridge is complete

Clifton Suspension Bridge, designed by Isambard Kingdom Brunel in the 19th Century, has undergone a major refurbishment - Image © Clifton Suspension Bridge Trust
The multi-million pound refurbishment of one of the world's oldest surviving iron suspension bridges has been completed.
Work to restore Clifton Suspension Bridge in Bristol began in April 2024, focusing on protecting its historic ironwork and installing an environmentally sustainable lighting system.
The project, which was funded through bridge tolls, represents the most significant conservation investment since the structure opened in 1864.
Bridge master Tristan Ralph, who oversaw the work, said it demonstrated the "long‑term responsibility to protect Brunel's extraordinary structure".
"Something that is a really key thing for us is that our only funding comes from the tolls," he said. "We don't get any money from local or central government."
The Clifton Suspension Bridge Trust said the conservation process will protect the ironwork from corrosion for the next 25 years. The work involved specialist engineers hand-painting more than 4,000 original iron chain links, many of which are more than 180 years old.
Ralph said: "The chains are incredibly difficult to get to, and very complicated to paint. We had to clean each of them individually and re-apply the paint. It was very meticulous work, using toothbrushes to get into every nook and cranny."
The project also saw the installation of a new lighting system designed to minimise light pollution and improve energy efficiency. The new illuminations will also allow the bridge to be lit up to mark significant moments in its history.
Ralph added: "The old lighting system was actually expired and unreliable, so this was a good time to change the lights. We will be lighting up for different themed-events celebrating the bridge's engineering and heritage, and significant cultural events, which is really exciting."

Clifton Suspension Bridge, designed by Isambard Kingdom Brunel in the 19th Century, has undergone a major refurbishment - Image © Clifton Suspension Bridge Trust
The multi-million pound refurbishment of one of the world's oldest surviving iron suspension bridges has been completed.
Work to restore Clifton Suspension Bridge in Bristol began in April 2024, focusing on protecting its historic ironwork and installing an environmentally sustainable lighting system.
The project, which was funded through bridge tolls, represents the most significant conservation investment since the structure opened in 1864.
Bridge master Tristan Ralph, who oversaw the work, said it demonstrated the "long‑term responsibility to protect Brunel's extraordinary structure".
"Something that is a really key thing for us is that our only funding comes from the tolls," he said. "We don't get any money from local or central government."
The Clifton Suspension Bridge Trust said the conservation process will protect the ironwork from corrosion for the next 25 years. The work involved specialist engineers hand-painting more than 4,000 original iron chain links, many of which are more than 180 years old.
Ralph said: "The chains are incredibly difficult to get to, and very complicated to paint. We had to clean each of them individually and re-apply the paint. It was very meticulous work, using toothbrushes to get into every nook and cranny."
The project also saw the installation of a new lighting system designed to minimise light pollution and improve energy efficiency. The new illuminations will also allow the bridge to be lit up to mark significant moments in its history.
Ralph added: "The old lighting system was actually expired and unreliable, so this was a good time to change the lights. We will be lighting up for different themed-events celebrating the bridge's engineering and heritage, and significant cultural events, which is really exciting."
Just noticed from this video on You Tube that the Heathrow expansion will cost £49bn. And people were complaining that HS2 is going to cost £100bn. HS2 seems like better value for money than Heathrow expansion.
| Re: Disused rail viaduct over the Spey at Garmouth fails In "Railway History and related topics" [380584/31260/55] Posted by Mark A at 22:09, 7th October 2026 | ![]() |
Removing the spans, a briefing for the community.
https://www.moray.gov.uk/media/ovnnu0jj/file168028.pdf
| Re: Bath disabled woman had to 'crawl on hands and knees' to get off GWR train In "London to Swindon and Bristol" [380583/32584/10] Posted by IndustryInsider at 21:51, 7th October 2026 | ![]() |
The Network Rail Western Region sectional appendix (Route 105) has Bath's platform 1 as 195m, even adding 6.5m extensions, it is still well short of a 260m 5+5 IET
Yes indeed. I mentioned up thread that all it will do is give a bit more stopping tolerance for the drivers, who have to be accurate to not much more than a foot at the moment, and it will standardise the stopping position for 9 and 10-car trains which will eliminate the risk of the driver stopping at the wrong one by mistake.
No more doors in total will be platformed though.
| Re: Engineering works 10 - 16 October 2026 In "London to Kennet Valley" [380582/32260/8] Posted by grahame at 20:55, 7th October 2026 | ![]() |
Grumpy ageing person here. Are the public suffering from information overload and too many sources of information? Did it work better when anything really important was sent out in the post only to those really affected?
Superb questions and massive challenge. I could write you a book on the subject - studied it quite a bit (and still do).
With dynamic and altering data, it becomes important to have it easily updated from a single source, and to have it headline to the right people when it changes.
At tiimes, yes, there is information overload. There are one or two of my sources that push me so much data that much of it washes over without me always appreciate what's there. And having headlines appear just when there is something of note on my daily social media feeds is really useful. There are lessons / morals in my comments that should help inform those people who generate the data.
| Re: UK destinations you wished you'd visited sooner. In "The West - but NOT trains in the West" [380581/32590/31] Posted by johnneyw at 20:48, 7th October 2026 Already liked by Ralph Ayres | ![]() |
The trouble with this sort of question is that of opportunity cost. Time and money dictate that I can't visit everywhere and how can I say that my life would be richer now if at any particular time I'd visited B instead of A? Perhaps one or two other life choices may be more debatable however.

| Re: To 'stockpile food' is now our Government's official policy, apparently In "The West - but NOT trains in the West" [380580/32456/31] Posted by broadgage at 19:26, 7th October 2026 | ![]() |
Surely, the wind-up versions. No batteries required.....
Would be killed by EMP unless suitable precautions taken.
| Re: Lostwithiel - footbridge, services and sidings (merged topic) In "Shorter journeys in Plymouth and Cornwall" [380579/2681/25] Posted by Kernow Otter at 19:18, 7th October 2026 | ![]() |
Spades actually in the ground on this now. Piling in November for full installation 'Before Spring'
| Re: Annoying / amusing use of completely irrelevant stock photos to illustrate press articles In "The Lighter Side" [380578/11558/30] Posted by Surrey 455 at 18:44, 7th October 2026 | ![]() |
And today's BBC entry to the competition is a picture of ...
Rail route to close in half term for 'essential' works

Buses will replace South Western Railway services between Staines and Windsor for seven days

Buses will replace South Western Railway services between Staines and Windsor for seven days
I looked at that picture and thought it looked similar to the approach to Guildford via Effingham Junction. I looked again and the train seems to have Guildford as its destination. It appears to be terminating on platform 1.
The picture has this undeniably valid label attached to it: "A blue and yellow South Western Railway train approaching a station."
It may have yellow on the front but I would describe most SWR trains as being blue and grey, with yellow at the ends.| Re: Swindon <-> Westbury service updates and amendments, ongoing discussion - 2026 In "TransWilts line - Swindon, Chippenham, Westbury" [380577/31359/18] Posted by Phil at 18:19, 7th October 2026 | ![]() |
Above are "facts" ... my personal opinion ... to follow
Personal opinion - effective attention from GWR to their customers in the area in which I live is a lot poorer than it was a even just a handful of years ago. But then perhaps I'm seeing things through rosy tinted spectacles, and getting older / more extreme / more critical? Where are my thoughts?
As discussion points, I find myself wondering from this array:
* Money Saving measures
* Staffing on revenue - lots on gatelines, fewer looking after other matters
* New marketing team / different layer and goals / masking the experts
* Company looking at short term goals, and staff at their future roles
* Less important line/service; prioritisation of freight
* Safety increase
* A heavier burden of rules and regulations
* Staff unable / not encouraged to take a look out of the box
* "Reliability", "simplification" and "being PC and modern" goals outweigh customer service
* talk at, not talk with approach from GWR to community
* I am retired and no longer of any consequence
* Our Wiltshire product is no longer the proud flagship "look how good we are" baby
I wouldn't argue with any of the above, and would possibly add the apparent reduction in the relevance/effectiveness of the Trans Wilts Community Rail Partnership as a possible factor
| Re: Swindon <-> Westbury service updates and amendments, ongoing discussion - 2026 In "TransWilts line - Swindon, Chippenham, Westbury" [380576/31359/18] Posted by grahame at 18:13, 7th October 2026 | ![]() |
17:50 Gloucester to Salisbury due 20:06
17:50 Gloucester to Salisbury due 20:06 will be cancelled.
This is due to more trains than usual needing repairs at the same time.
17:50 Gloucester to Salisbury due 20:06 will be cancelled.
This is due to more trains than usual needing repairs at the same time.
| Woodley bridges to close for landslip works In "London to Reading" [380575/32591/7] Posted by Marlburian at 18:10, 7th October 2026 | ![]() |
The bridge in Warren Road, Woodley, will shut on Monday until spring 2028 so work can be done following incidents in 2020 and 2024, which disrupted rail services.
The bridge in Butts Hill Road will also close to vehicles from 9 November until mid-January 2027, but will remain open to pedestrians, unlike the Warren Road bridge.
https://www.bbc.co.uk/news/articles/cqp8gx48ydeko
| Re: 50th anniversary of the introduction of HST's on the route In "London to Swindon and Bristol" [380574/32580/10] Posted by John D at 18:07, 7th October 2026 | ![]() |
Whilst the HSTs were a big leap forward, and funding restrictions meant there was never enough of them nationally, it is also other anniversaries
45 years ago, France introduced the TGV, initially restricted to 260km/h (162mph), later increased to 270km/h (168mph), with later generations rated at 300km/h (186mph) and latest at 320km/h (199mph)
The HST was good at over 2 miles a minute, but nowadays seems slow with trains doing 3.3 miles a minute
| Re: Bath disabled woman had to 'crawl on hands and knees' to get off GWR train In "London to Swindon and Bristol" [380573/32584/10] Posted by John D at 17:59, 7th October 2026 | ![]() |
This is often a risk when a train is in reverse formation.
A train I was on yesterday was bound for Weston-super-Mare but had the first class coaches leading.
A train I was on yesterday was bound for Weston-super-Mare but had the first class coaches leading.
It appears no one at Paddington spotted they were putting someone on part of the train which would be off platform, and nothing was done by train manager at any intermediate stations either.
The Network Rail Western Region sectional appendix (Route 105) has Bath's platform 1 as 195m, even adding 6.5m extensions, it is still well short of a 260m 5+5 IET
How just about every platform on a route ended up a different length is a mystery to me (why would longest train vary between consecutive stations)
Chippenham both 239m
Bath Spa plat 1 195m, plat 2 279m
Oldfield Park both 129m
Keynsham both 209m
| Re: To 'stockpile food' is now our Government's official policy, apparently In "The West - but NOT trains in the West" [380572/32456/31] Posted by broadgage at 16:05, 7th October 2026 | ![]() |
Also, valve radios preferred...
Mark
Valve radios certainly preferable as EMP resistant. Has the drawback of needing more power, and non standard batteries. Production of suitable batteries ceased years ago, alternatives are available but add significant cost and complexity.Mark
I would use modern transistor radios, with one in use and two spares, stored in two layers of EMP protection.
| Re: Engineering works 10 - 16 October 2026 In "London to Kennet Valley" [380571/32260/8] Posted by eightonedee at 15:45, 7th October 2026 | ![]() |
Grumpy ageing person here. Are the public suffering from information overload and too many sources of information? Did it work better when anything really important was sent out in the post only to those really affected?
| UK destinations you wished you'd visited sooner. In "The West - but NOT trains in the West" [380570/32590/31] Posted by grahame at 15:31, 7th October 2026 | ![]() |
from https://www.which.co.uk/reviews/uk-destinations/article/guides

Now I'm not sure if they're looking for places you haven't yet visited ... or places that you didn't visit until your 40s when they would have been fun in your 20s.
I have been so ... lucky ... and was, earlier, to visit just about all UK destinations I might wish. For places I haven't visited - perhaps Lindisfarne ... Orkneys, Shetlands, Outer Hebrides. Wish I had seen earlier? Perhaps Bath and other places to the south west of there/here which I never really knew until I moved down this way in around 1982.
| Re: To 'stockpile food' is now our Government's official policy, apparently In "The West - but NOT trains in the West" [380569/32456/31] Posted by ChrisB at 14:31, 7th October 2026 | ![]() |
Surely, the wind-up versions. No batteries required.....