| Re: Manvers Street, Bath, disrupted for reconstruction works for 6 months from May. In "Buses and other ways to travel" [382006/31887/5] Posted by grahame at 06:52, 17th November 2026 | ![]() |
I was in Bath yesterday - home in Melksham to the RUH for an assessment, and back. Every cloud has a silver lining, and the continued closure of Manvers Street "forced" a walk across the city - from Grand Parade (route 271) to the Bus Station (for route 4) on the way to the hospital, and from Queens Square (route 20) back to the Guildhall (for route 272) on return.
It will be good to have the buses joined up again in a few days, though I hear more works may be needed on the next section of Manvers Street in the late winter and spring. For friends and general readers I have posted here on Facebook a selection of photos taken on that walk. Here on the Coffee Shop, some comment on the journeys and public transport experience.
In terms of the road works and current fractured / flawed setup in Bath, Faresaver who operate the 271/2/3 from Melksham and the 231/x31 from Chippenham and 228 from Colerne are making the best of a bad job, and for fit regular / local public-transport savvy people it's working. Which, however, does not work for people new to the system or not able or wanting to walk through the city. We took a mutual decision that Lisa would not be joining me, muchly for the transfer issue; were the connection be smooth in the bus station area as it used to be, we would have gone together and enjoyed a meal at one of the excellent outlets near the transport hub. And should my next RUH visit, which will potentially be a "biggie" be during a fracture, I will be required to have a lift home.
So how is the information system working? Not as well as it should; there is sufficient incorrect data or missing data there - from Faresaver, from FirstBus and from the public (WECA / BaNES?) system.
The incoming 271 into Bath has a lovely new display about the next stop - great, except that it told us that the bus carried on past Grand Parade to Manvers Street and the Bus Station. I checked with the driver, and she looked at me as if I was thick and told me that it terminated at Grand Parade because of roadworks and that I should report the problem to Faresaver (which I thought I was doing by speaking with their driver).

At Bath Bus Station (correction - Dorchester Street stops outside the bus station) the labelling of the bus stop for the RUH - the bus headed to Weston - says it's the stop for Odd Down - the bus in the other direction - and it made no note of Weston or the hospital. Again "need to know". The bus itself WAS labelled "Weston via the RUH) which the driver confirmed a couple of times to passengers joining.

On the way back at the Guildhall, I know where the 272 (and 271) leave from. The crowds were big there ... and seemingly only some of the buses on the digital display. Not a problem for regulars or savvy people - I know that during the day buses for Melksham run at :18 and :48 and, sure enough, the 272 turned up unannounced on the digital display at about the right time, and stopped a few bus lengths away because the stop was already occupied by other vehicles, and passenger flowed to it, so clearly most people knew, had been looking out for it, and caught it.

Both return buses - the 20 from the RUH to Queens Square and the 272 into Devizes - as yet don't have information on board telling people where they are; the 20 was a route I have not used before and for some of the way, through parts of Bath I don't know, I tracked on my phone. As we got towards the centre, I gambled as to where the bus would go and where the stops would be and a display would have been nice. A display with wrong information would have been misleading / worse than useless to me as a new user of the route.

Big Lemon on route 20 at Queens Square for Bath City
| Re: Different outlooks on nationalisation - GWR and Chiltern In "Chiltern Railways services" [382005/32728/44] Posted by IndustryInsider at 05:44, 17th November 2026 | ![]() |
Chiltern have been pretty hopeless the last five or so years. All these extra trains are doing is partly restoring the timetable that operated before Covid.
...just slower! Oxford Parkway to Marylebone was 58 minutes when it opened. It's now usually ~80 minutes, or 68 on a couple of remaining fast-ish trains. I understand the argument that now Oxford (Central) has a half-hourly IET then Chiltern doesn't need to duplicate the fast trains, but it does seem to weaken the case for having built Parkway.
Indeed. Hence the use of the word ‘partly’. Good if you’re going from Oxford to High Wycombe I suppose!
| Re: Bucket list day - and with a cherry on top! In "Introductions and chat" [382004/26883/1] Posted by grahame at 04:48, 17th November 2026 | ![]() |
Err ... just for completeness here, grahame: what was 'a cherry on top!'?
CfN.
CfN.

Wuppertal but I don't know about the cherry.
For me, the cherry is that the Schweberbahn - although well modernised - fascinates me. It still uses, unmodified, the technology of 125 years ago when first opened. I love it.
For me, the cherry is that the Schweberbahn - although well modernised - fascinates me. It still uses, unmodified, the technology of 125 years ago when first opened. I love it.
My extra was watching a diesel bus convert to an electric trolley bus in about 30 seconds. Ideal for places like Bath where they don't want the city centre sullied with overhead wires, but have steep hills that the trolley bus would be ideal for.
And I have seen this conversion in a couple of other places since; no longer quite as special, but not made any appearance yet in the UK that I am aware of.
| Re: Bus roof torn off on impact under railway bridge incidents - merged topics In "Buses and other ways to travel" [382003/6748/5] Posted by Chris from Nailsea at 00:51, 17th November 2026 | ![]() |
Another incident, from Leicestershire, this time.
From the BBC:
Double-decker bus crashes into railway bridge

The double-decker bus hit the railway bridge in New Road on Monday morning - Image © Kibworth Beauchamp Parish Council
Trains were stopped after a double-decker bus crashed into a railway bridge in Leicestershire.
Emergency services were called to the railway bridge over New Road in Kibworth shortly after 07:25 GMT on Monday.
A spokesperson for Network Rail said trains were temporarily stopped "as a precaution" while the bus was removed from under the bridge, and the railway lines reopened at about 08:45.
Leicestershire Fire and Rescue Service confirmed no-one was injured in the crash.

The bus was removed from under the bridge by a recovery team - Image © Katie Jaffar
A spokesperson for the fire service said its crews from Market Harborough and Wigston Fire Station attended the scene, along with colleagues from Leicestershire Police and East Midlands Ambulance Service.
The bus driver was able to exit the bus and there were no injuries.
"The bus was removed from under the bridge by recovery services, and Network Rail inspected the bridge for damage. The railway line and road have now reopened," the fire service added.
A Network Rail spokesperson added: "As a precaution, trains were temporarily stopped while the vehicle was removed. The lines reopened at around 08:45 and we're grateful for passengers' patience."

The double-decker bus hit the railway bridge in New Road on Monday morning - Image © Kibworth Beauchamp Parish Council
Trains were stopped after a double-decker bus crashed into a railway bridge in Leicestershire.
Emergency services were called to the railway bridge over New Road in Kibworth shortly after 07:25 GMT on Monday.
A spokesperson for Network Rail said trains were temporarily stopped "as a precaution" while the bus was removed from under the bridge, and the railway lines reopened at about 08:45.
Leicestershire Fire and Rescue Service confirmed no-one was injured in the crash.

The bus was removed from under the bridge by a recovery team - Image © Katie Jaffar
A spokesperson for the fire service said its crews from Market Harborough and Wigston Fire Station attended the scene, along with colleagues from Leicestershire Police and East Midlands Ambulance Service.
The bus driver was able to exit the bus and there were no injuries.
"The bus was removed from under the bridge by recovery services, and Network Rail inspected the bridge for damage. The railway line and road have now reopened," the fire service added.
A Network Rail spokesperson added: "As a precaution, trains were temporarily stopped while the vehicle was removed. The lines reopened at around 08:45 and we're grateful for passengers' patience."
| Re: Bucket list day - and with a cherry on top! In "Introductions and chat" [382002/26883/1] Posted by Chris from Nailsea at 00:20, 17th November 2026 | ![]() |
Err ... just for completeness here, grahame: what was 'a cherry on top!'?
CfN.

| Re: Railway bridges struck by road vehicles - many incidents, ongoing discussion In "The Wider Picture in the United Kingdom" [382001/8910/51] Posted by Chris from Nailsea at 00:04, 17th November 2026 | ![]() |
The A5 Watling Street rail bridge, yet again.

From the BBC:
Rail bridge tops 'Britain's most bashed' list again

The A5 Watling Street railway bridge was hit twice in two days in August - Image © Hinckley Town Centre
A railway bridge in Leicestershire that was recently hit twice in two days has retained the dubious honour as Britain's most bashed bridge.
On Sunday, Network Rail said the A5 Watling Street bridge in Hinckley had topped its 2025-26 list, with 26 strikes between 1 April 2025 and 31 March. A further 13 have been reported up to August.
Campaigners have been pushing for measures to end disruption caused by the crashes, including lowering the road under the bridge, but Network Rail is yet to sign off the scheme.
Network Rail said 1,706 bridge strikes were recorded in 2025-26, causing 185,319 minutes of delays and costing about £13.25m in delays, cancellations and repairs.
It added it was working with transport bodies and authorities to improve awareness, and was using technology to reduce incidents and speed up its response to strikes across Britain.
Last year, the Watling Street bridge was again named Britain's most bashed bridge, after it was struck 22 times in the 2024-2025 financial year.
(BBC article continues, with more statistics and details)

The A5 Watling Street railway bridge was hit twice in two days in August - Image © Hinckley Town Centre
A railway bridge in Leicestershire that was recently hit twice in two days has retained the dubious honour as Britain's most bashed bridge.
On Sunday, Network Rail said the A5 Watling Street bridge in Hinckley had topped its 2025-26 list, with 26 strikes between 1 April 2025 and 31 March. A further 13 have been reported up to August.
Campaigners have been pushing for measures to end disruption caused by the crashes, including lowering the road under the bridge, but Network Rail is yet to sign off the scheme.
Network Rail said 1,706 bridge strikes were recorded in 2025-26, causing 185,319 minutes of delays and costing about £13.25m in delays, cancellations and repairs.
It added it was working with transport bodies and authorities to improve awareness, and was using technology to reduce incidents and speed up its response to strikes across Britain.
Last year, the Watling Street bridge was again named Britain's most bashed bridge, after it was struck 22 times in the 2024-2025 financial year.
(BBC article continues, with more statistics and details)
We here on the Coffee Shop forum have perhaps read it all before - but it seems rather too many lorry drivers are still oblivious to the issue.
CfN.

| A37 closed after bus wedged in garden hedge after veering off road - 15 Nov 2026 In "Buses and other ways to travel" [382000/32732/5] Posted by Chris from Nailsea at 23:09, 16th November 2026 | ![]() |
From the BBC:
Bus wedged in garden hedge after veering off road

The crash happened at about 12:00 GMT on Sunday
A bus remains wedged in someone's garden a day after it veered off the road.
The bus crashed into a driveway of a house on the A37, in Chilthorne Domer in Somerset, at about 12:00 GMT on Sunday. Police confirmed nobody was injured in the single-vehicle collision.
A spokesperson for First Bus said the company was working with emergency services to remove the number 376 bus from the garden.
The garden and driveway of the property were damaged in the crash and Avon and Somerset Police said a nearby telecommunications pole was also being assessed. It added that the road would remain closed while the scene was assessed for safety reasons.

The crash happened in Chilthorne Domer, near Yeovil
First Bus said it was investigating the circumstances which led up to the crash and did not yet know why the bus left the carriageway. "The safety of our customers, communities and staff is always our top priority," it added.

The crash happened at about 12:00 GMT on Sunday
A bus remains wedged in someone's garden a day after it veered off the road.
The bus crashed into a driveway of a house on the A37, in Chilthorne Domer in Somerset, at about 12:00 GMT on Sunday. Police confirmed nobody was injured in the single-vehicle collision.
A spokesperson for First Bus said the company was working with emergency services to remove the number 376 bus from the garden.
The garden and driveway of the property were damaged in the crash and Avon and Somerset Police said a nearby telecommunications pole was also being assessed. It added that the road would remain closed while the scene was assessed for safety reasons.

The crash happened in Chilthorne Domer, near Yeovil
First Bus said it was investigating the circumstances which led up to the crash and did not yet know why the bus left the carriageway. "The safety of our customers, communities and staff is always our top priority," it added.
| East Yorkshire rail services restored after leaves disruption - In "The Wider Picture in the United Kingdom" [381999/32731/51] Posted by Chris from Nailsea at 22:34, 16th November 2026 | ![]() |
From the BBC:
Rail services restored after leaves disruption

Northern services have been missing out some stops in East Yorkshire - Image © BBC/Daisy Reinsch
Rail services in East Yorkshire have returned to normal after some trains did not stop at stations due to "slippery" leaves on the tracks.
The cancelled stops by Northern were criticised by local MPs, who wrote to the company asking what was being done to deal with the problem. Hull North and Cottingham MP Dame Diana Johnson had said the annual autumn fall of leaves was "clearly not a new problem for the rail industry".
In response, Northern apologised for the disruption and said more than £17m was spent in the region each year by Network Rail on "vegetation management". It added: "Unfortunately, despite these efforts we can't yet completely eradicate the issue."
During the disruption, services between Scarborough and Hull did not call at Driffield, Beverley or Cottingham, but trains on the Hull to Bridlington route did stop at the three stations.
Sam MacDougall, from Northern, said the timetable had to be altered "so we could safely run services without causing significant disruption to the wider rail network".
He added: "We would like to apologise to the passengers who have been affected by the disruption in recent weeks. This autumn has been challenging as a large amount of leaves, which fell during two storms, made the tracks very slippery and interfered with the signalling system. This meant that some services were running at slower speeds and being held at red signals for longer, to ensure they kept a safe distance from other trains."

Northern services have been missing out some stops in East Yorkshire - Image © BBC/Daisy Reinsch
Rail services in East Yorkshire have returned to normal after some trains did not stop at stations due to "slippery" leaves on the tracks.
The cancelled stops by Northern were criticised by local MPs, who wrote to the company asking what was being done to deal with the problem. Hull North and Cottingham MP Dame Diana Johnson had said the annual autumn fall of leaves was "clearly not a new problem for the rail industry".
In response, Northern apologised for the disruption and said more than £17m was spent in the region each year by Network Rail on "vegetation management". It added: "Unfortunately, despite these efforts we can't yet completely eradicate the issue."
During the disruption, services between Scarborough and Hull did not call at Driffield, Beverley or Cottingham, but trains on the Hull to Bridlington route did stop at the three stations.
Sam MacDougall, from Northern, said the timetable had to be altered "so we could safely run services without causing significant disruption to the wider rail network".
He added: "We would like to apologise to the passengers who have been affected by the disruption in recent weeks. This autumn has been challenging as a large amount of leaves, which fell during two storms, made the tracks very slippery and interfered with the signalling system. This meant that some services were running at slower speeds and being held at red signals for longer, to ensure they kept a safe distance from other trains."
| Re: Manvers Street, Bath, disrupted for reconstruction works for 6 months from May. In "Buses and other ways to travel" [381998/31887/5] Posted by Mark A at 22:31, 16th November 2026 | ![]() |
Milsom Street photo from this afternoon.
Erm ... that picture is Manvers Street, not Milsom Street.

Oops, ta, corrected it with an edit.
Milsom Street photo from this afternoon.
Erm ... that picture is Manvers Street, not Milsom Street.

| Re: 25.11.2026 / WWRUG talk South Wales Metro and lessons for Bath and Wiltshire In "Bristol and Bath (WECA, now WEMCA)" [381996/32729/21] Posted by Noggin at 21:51, 16th November 2026 | ![]() |
Should be a good talk. I wonder if given the chance to do things differently, they would still opt for discontinuous electrification, or would spend the money on civil engineering instead?
| Nailsea & Backwell station - Road Replacement Bus, 14 November 2026 In "Bristol and Bath (WECA, now WEMCA)" [381995/32730/21] Posted by Chris from Nailsea at 21:42, 16th November 2026 | ![]() |
I have been contacted, in a PM, by one of our respected bus driver members of the this Coffee Shop forum, with some information to form the basis of this topic.
From the bus driver, posting on flickr, he wrote:
My first ever visit to Yatton, I was standby and sent to cover a missing vehicle that had been sent home for lack of Audio announcements. Being a decker I couldn’t access Nailsea and Backwell and served Backwell crossroads instead.
From additional information in his PM to me, I can say that I was not affected personally by this incident:
Hopefully you, or your fellow Nailsea residents weren’t waiting for the 11:26 rail replacement bus to Bristol on Saturday.
Another operator was sent home for not having next stop announcements on their single decker, I was the standby but I had a double decker so couldn’t get up to the station! I dropped a few off at Backwell crossroads as a compromise!
Maybe a topic is waiting for this….
Another operator was sent home for not having next stop announcements on their single decker, I was the standby but I had a double decker so couldn’t get up to the station! I dropped a few off at Backwell crossroads as a compromise!
Maybe a topic is waiting for this….
I am happy to start this topic. I also commend this bus driver for not attempting to drive a double decker under the railway bridge at Nailsea & Backwell: it clearly won't fit - but other bus drivers have attempted it, in the past.
CfN.

| Re: Different outlooks on nationalisation - GWR and Chiltern In "Chiltern Railways services" [381994/32728/44] Posted by Richard Fairhurst at 21:12, 16th November 2026 | ![]() |
Chiltern have been pretty hopeless the last five or so years. All these extra trains are doing is partly restoring the timetable that operated before Covid.
...just slower! Oxford Parkway to Marylebone was 58 minutes when it opened. It's now usually ~80 minutes, or 68 on a couple of remaining fast-ish trains. I understand the argument that now Oxford (Central) has a half-hourly IET then Chiltern doesn't need to duplicate the fast trains, but it does seem to weaken the case for having built Parkway.
| Re: Night Riviera Sleeper train - between Paddington and Penzance - ongoing discussion In "London to the West" [381993/31911/12] Posted by Mark A at 20:50, 16th November 2026 | ![]() |
Ah, it arrived at Exeter Central from the east.
https://www.realtimetrains.co.uk/service/gb-nr:W34771/2026-11-12/detailed#allox_id=0
| Re: Night Riviera Sleeper train - between Paddington and Penzance - ongoing discussion In "London to the West" [381992/31911/12] Posted by eXPassenger at 20:44, 16th November 2026 | ![]() |
No need to run round at Exeter to go from Central to Taunton
They would need to run round at Central to get it back to Taunton.
| Re: Swindon <-> Westbury service updates and amendments, ongoing discussion - 2026 In "TransWilts line - Swindon, Chippenham, Westbury" [381991/31359/18] Posted by grahame at 19:55, 16th November 2026 | ![]() |
17:50 Gloucester to Salisbury due 20:06
17:50 Gloucester to Salisbury due 20:06 will be terminated at Warminster.
It will no longer call at Salisbury.
It has been previously delayed and is now 29 minutes late from Chippenham.
This is due to passengers causing a disturbance on this train.
17:50 Gloucester to Salisbury due 20:06 will be terminated at Warminster.
It will no longer call at Salisbury.
It has been previously delayed and is now 29 minutes late from Chippenham.
This is due to passengers causing a disturbance on this train.
| Re: Different outlooks on nationalisation - GWR and Chiltern In "Chiltern Railways services" [381990/32728/44] Posted by LiskeardRich at 19:33, 16th November 2026 Already liked by Chris from Nailsea | ![]() |
No change…
So continuation of the existing unreliable service? Delay repay is almost a guarantee at the moment.
So continuation of the existing unreliable service? Delay repay is almost a guarantee at the moment.
Not if/when GBR/DfT remove the 15-29 minute refund band!
They were a bit prompt this weekend. Delay repay approved within 24 hours of submitting! Last one took 29 days.
| Re: Railway bridges struck by road vehicles - many incidents, ongoing discussion In "The Wider Picture in the United Kingdom" [381989/8910/51] Posted by Clan Line at 19:04, 16th November 2026 | ![]() |
This link: https://www.bbc.co.uk/news/articles/cm868wp5852wo includes this:

The railway doesn't cross Warminster Road in Westbury - presume it should refer to Wilton ?
| Re: Manvers Street, Bath, disrupted for reconstruction works for 6 months from May. In "Buses and other ways to travel" [381988/31887/5] Posted by Mark A at 17:46, 16th November 2026 | ![]() |
An update: the works to Manvers Street look to be on course to complete on time for the predicted reopening date. The top surface of tarmac went down last night. Pleasingly, the entire length of the pavements alongside have been put in to good order as well, and the crossings of the entrances to what was the police station have been tamed. That'll at least allow the Faresaver buses to run to the bus station, and perhaps we'll have some progress on the stopping patterns.
Given that there may be a series of additional closures in the offing the entire 'Access across the city' aspect of this really needs addressing, but with the Guildhall - Manvers Street access being the only practicable option for buses approaching from the London Road, for public transport, I can't come up with any suggestion more sensible than what the French would call a 'Petite Train' operation via New Bond Street / Union Street / Stall Street / Southgate. Shame the river can't be used: the Avon has no manners though.
Manvers Street photo from this afternoon.

| Re: Class 175s to Great Western Railway (GWR) In "Across the West" [381987/28982/26] Posted by a-driver at 16:26, 16th November 2026 | ![]() |
There’s 5 or 6 available for passenger service, a further 5 will probably clear their fault free running period this week.
| Re: Different outlooks on nationalisation - GWR and Chiltern In "Chiltern Railways services" [381986/32728/44] Posted by TaplowGreen at 16:20, 16th November 2026 | ![]() |
No change…
So continuation of the existing unreliable service? Delay repay is almost a guarantee at the moment.
So continuation of the existing unreliable service? Delay repay is almost a guarantee at the moment.
Not if/when GBR/DfT remove the 15-29 minute refund band!
.......would that constitute a "radical change"?
| Re: Different outlooks on nationalisation - GWR and Chiltern In "Chiltern Railways services" [381985/32728/44] Posted by IndustryInsider at 15:41, 16th November 2026 | ![]() |
No change…
So continuation of the existing unreliable service? Delay repay is almost a guarantee at the moment.
So continuation of the existing unreliable service? Delay repay is almost a guarantee at the moment.
Not if/when GBR/DfT remove the 15-29 minute refund band!
| Re: Different outlooks on nationalisation - GWR and Chiltern In "Chiltern Railways services" [381984/32728/44] Posted by LiskeardRich at 13:43, 16th November 2026 | ![]() |
No change…
So continuation of the existing unreliable service? Delay repay is almost a guarantee at the moment.
Cancellations to services at Exeter St Davids
Following urgent repairs to the track earlier today at Exeter St Davids all lines will be reopened shortly.
Train services running through this station may be cancelled or delayed. Disruption is expected until 10:00 15/11.
1A77 0830 Exeter St Davids to London Paddington left Exeter at 0931.
1A78 0827 Plymouth to London Paddington running 12 late approaching Starcross.
Following urgent repairs to the track earlier today at Exeter St Davids all lines will be reopened shortly.
Train services running through this station may be cancelled or delayed. Disruption is expected until 10:00 15/11.
1A77 0830 Exeter St Davids to London Paddington left Exeter at 0931.
1A78 0827 Plymouth to London Paddington running 12 late approaching Starcross.
I was on rail replacement Bristol Temple Meads to Weston Super Mare yesterday. We didn’t have a train arrive from the west until 1100, and thus no departure back until 1122 I think it was. We were bringing in bus loads to find no onward train.
The station manager did an excellent job arranging taxis and I’ve never seen so many taxis turning up at once!
Chiltern have been pretty hopeless the last five or so years. All these extra trains are doing is partly restoring the timetable that operated before Covid. Something GWR did years ago.
And, yes, don’t mention EWR!
| Re: Different outlooks on nationalisation - GWR and Chiltern In "Chiltern Railways services" [381981/32728/44] Posted by Ralph Ayres at 11:07, 16th November 2026 Already liked by IndustryInsider, Mark A | ![]() |
"This is our first timetable change as a publicly owned railway", say Chiltern. Demonstrably true, but irrelevant as the changes would have been in the pipeline well before coming back into public ownership. They (or rather the DfT) want us to make a connection but much like SWR's "new" rolling stock, they are not the result of the switch. If only improvements really could be delivered that quickly!
(and shush, don't mention East West Rail!)
| Re: Night Riviera Sleeper train - between Paddington and Penzance - ongoing discussion In "London to the West" [381980/31911/12] Posted by rogerw at 11:00, 16th November 2026 | ![]() |
No need to run round at Exeter to go from Central to Taunton
| Re: Night Riviera Sleeper train - between Paddington and Penzance - ongoing discussion In "London to the West" [381979/31911/12] Posted by Witham Bobby at 10:37, 16th November 2026 | ![]() |
[SNIP]
Thanks to the broken rail at Exeter St David's, the Sleeper spent an hour or so at Exeter Central, then was sent up to Taunton (presumably because of lack of space at St David's) and stabled there for a short while before reversing and continuing its journey down to Penzance some 5 hours down.
A sensible bit of railway work. Was there already a loco on the rear of the service as it arrived at Exeter? Or did they find a way to run the train engine round onto what was the back end of the train? And again at Taunton? Such a rarity, these days, with passenger trains
Ahh the memories of a WSR team led by Harry Lee having the run of Pwhelli station in 1975 to dismantle and remove the parachute style water tower from the end of the island platform and from the closed loco shed area. No British Rail staff present - just allowed to get on with it on a Sunday when no trains were running. The relationship we had with everywhere on BR, except, sadly, the Bristol Division of the WR
Good luck to the NLR in their extraction of this relic. It's amazing that it has survived
One of the Pwhelli towers lives on at Minehead. I can't say what's happened to others
Mark Hopwood's GWR team have done a good job there, then.


I think I would go for fair or ok, rather than higher status of good.
More plodding along, middling rather being up with best operators.
And never managed to get a business case that meant Project Churchward and replacing aging DMUs was only economic sensible scenario, rather than do nothing for time being option.
A "C" at very best.
Latterly in thrall to the DfT but plenty of missed opportunities in earlier years when GWR had more control - cans kicked down the road or issues left on the "too difficult" pile.
I would have liked to have seen a more visibly robust challenge by Hopwood to Network Rail over the continued and deteriorating state of the infrastructure on the LTV corridor and its impact on his services and customers - even Mayor Sir Lord Khan chipped in on that one - but I guess the MD and others had their eyes on a future sinecure as part of a nationalised organisation and didn't wish to rock the boat.........and that seems to have come to pass.
Can't help thinking it may be time for a new hand on the tiller and a fresh approach however whilst generously rewarded by the taxpayer, those hands may be secured with cuffs under the dead hand of Government..........looking at Burnham's priorities it will probably be crumbs from the table going forward for rail.