This is a test of GDPR / Cookie Acceptance [about our cookies]
Really irritating test - cookie expires in 24 hour!
[OTD] 19th Feb (2011) - Welsh Highland reopens throughout
 
[OTD] 19th Feb (2011) - Welsh Highland reopens throughout
Posted by grahame at 13:27, 19th February 2026
 
From CymruRails

On this day, 19th February 2011, a long held dream became a reality as the first public passenger train operated the full length of the restored Welsh Highland Railway between Caernarfon and Porthmadog Harbour

This 25 mile journey takes passengers through some of the most dramatic scenery in Britain, including the village of Beddgelert and the spectacular Aberglaslyn Pass. While the restoration was a modern triumph, the railway's roots date back much further. The original WHR was formed in 1922, succeeding the horse drawn Croesor Tramway which had served the quarries since 1863. Unfortunately, the first era of the WHR was short lived, hampered by outdated, uncomfortable carriages and a reputation for being unreliable, the line closed in 1933. Today’s restored railway is a far cry from those early struggles, standing as a world-class heritage attraction and a testament to decades of hard work and vision.

Re: [OTD] 19th Feb (2011) - Welsh Highland reopens throughout
Posted by Mark A at 18:39, 19th February 2026
 
Indeed, and even better, isn't the through journey around 40 miles rather than 25?

Mark

Re: [OTD] 19th Feb (2011) - Welsh Highland reopens throughout
Posted by johnneyw at 20:39, 19th February 2026
 
Indeed, and even better, isn't the through journey around 40 miles rather than 25?

Mark

I presume you mean if you add on the 15 mile Ffestiniog railway stretch from Porthmadoc it comes to about 40 miles. 
The WHR is truly world class.  When we took it we were staying at Bedgelert campsite with our tents right next to the campsite station.... which somewhat minimised the risk of missing the train.

Re: [OTD] 19th Feb (2011) - Welsh Highland reopens throughout
Posted by Oxonhutch at 21:53, 19th February 2026
 
In my Southern African days many decades ago, I remember seeing these very same Garrett locomotives hauling trains, mainly goods, in the sub-tropical heat of Natal and the Eastern Cape. The poor old fireman was stuck sweating inside the cab feeding the fire and managing the boiler - while the driver swung his stool right around to the outside of the locomotive into the cooler fresh air, driving the engine through the open window in relative comfort - regulator, reverser and brake within easy reach.

Visiting the WHR, I pointed this out to the driver and the seat mechanism in the cab which had now been fixed in place. He was surprised to see, that without the Welsh modification, it could have indeed been swung completely out. In Wales, that would have been very unwise. 

Re: [OTD] 19th Feb (2011) - Welsh Highland reopens throughout
Posted by Mark A at 22:17, 19th February 2026
 
Ah. WHR trackbed in the cutting by Nantmor, September 2005.

Mark


Re: [OTD] 19th Feb (2011) - Welsh Highland reopens throughout
Posted by Chris from Nailsea at 22:37, 19th February 2026
 

... while the driver swung his stool right around to the outside of the locomotive into the cooler fresh air ...


Sorry: for a moment there, I misread that as, "his tool" 


 
The Coffee Shop forum is provided by customers of Great Western Railway (formerly First Great Western). The views expressed are those of the individual posters concerned. Visit https://www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site at admin@railcustomer.info if you feel that the content provided by one of our posters contravenes our posting rules. Our full legal statment is at https://www.greatwesternrailway.info/legal.html

Although we are planning ahead, we don't know what the future will bring here in the Coffee Shop. We have domains "firstgreatwestern.info" for w-a-y back and also "greatwesternrailway.info"; we can also answer to "greatbritishrailways.info" too. For the future, information about Great Brisish Railways, by customers and for customers.
 
Current Running
GWR trains from JourneyCheck
 
 
Code Updated 11th January 2025